Bridge Construction

Flinns Road

As the head contractor, Road & Bridge were engaged by the Department of Environmental, Land, Water & Planning (DELWP) for the design and construction of a new 10m single span bridge to replace the existing timber bridge on Flinns Road, Nunniong in East Gippsland.

Due to the remote location and high altitude of this crossing, in conjunction with our design partners BG&E, we developed a design that eliminated any cast in-situ concrete works on site. Furthermore, due to favourable ground conditions for driven piles we were able to eliminate the need for any cast in- situ concrete works on-site.