Bridge Replacement

Factory Road

Road & Bridge completed this project for the Baw Baw Shire Council, which involved the construction of two new bridges alongside the existing bridges to maintain access throughout the works.

The project was undertaken in a highly constrained environment with environmentally sensitive waterways, requiring careful staging and coordination of works.

The smaller of the two bridges was a simply supported plank bridge with an in-situ reinforced concrete deck, while the larger bridge was designed as an integral plank bridge, also featuring an in-situ deck.